Welcome to Quoc Cuong Trading Construction Co., Ltd! Typical brands, products and services of APEC 2017. Typical entrepreneurs of APEC 2017. Reliable suppliers in Vietnam * Reliable and quality enterprises in 2009, 2010, 2011, 2012, 2013, 2014, 2015 & 2016 * Contact to see a specialist 0988 55 88 79 * 0903 831 312. xaynha.com; bietthudep.com.vn; nhatienche.vn; quoccuong.com.vn; nhatheptienche.net; nhavuon.net.vn

Home
About Us
Services
Projects
Contact
Recruitment
Building Guide

DESIGN NEWS

CONSTRUCTION NEWS

DESIGN FACTORY

 

Factory design, factory building, prefabricated model beautiful

- There is no construction design consultant, factory design, warehouse design, factory design, office design ... the real investor can still build the project.Even the preparation of the application for a construction permit in step 2 can also be hired by a consultant. However, the role of a design consultant for a construction project is more than that.

- Hire a workshop design consultant (provided that the good design consultant has many years of experience in the office, especially outside the field experience) for his / her project, the developer is What? First of all, they will have a well-structured, coherent structure that is consistent with the functions and requirements of the production line. The space will make the most of the area to work, living, production, traffic and ventilation. The space is interwoven into the green spaces of ornamental plants, soften the architectural lines dry, reduce dust, reduce noise, prevent fire spread ...

- Hire a workshop design consultant (provided that the good design consultant has many years of experience in the office, especially outside the field experience) for his / her project, the developer is What? They also have a beautiful appearance outside the house, suitable for personal preferences and requirements, suitable for the surrounding urban environment, suitable for the technology of construction and building materials. The most advanced, affirmed the owner's style, promote the use of.

- Hire a workshop design consultant (provided that the good design consultant has many years of experience in the office, especially outside the field experience) for his / her project, the developer is What? From the time when the work was unformed, they were able to see intuitively, feel the space of the works to make appropriate adjustments, avoid errors and discomfort when the construction was actually built. make it and it is very difficult to change the inappropriate points. Investors can also know and estimate the cost of the entire project, from the master to the small details, to adjust the types of materials to suit, avoid the overhead costs. in the process of construction, ensuring the schedule.

- In addition, to some consulting units have research on feng shui, investors are also calculated space, the main door layout, stairs, the director room, so that when work is quiet mind, comfort, good fortune, a leverage for career and health. Office design, factory ... need to attract gas to the project.Enlightenment can be like the radio station, like the bright, neat, neat, clean, green grass, like the fragrant smell, mellow sound, cheerful ... and vice versa The gas is afraid of the dark, cluttered, dirty. The gas does not like the fading, barren, devastated .... Gas into many works and stored is very good for you.

- When planning to build a building, the developer should provide the designer with brief information about the land and its use, the production line, the number of office workers, the number of workers work load, load capacity of production equipment, load for workshop floor, warehouse floor. What to wear, how many vehicles to load ... The more detailed the list of details, the more designers have the basis to imagine the working conditions, production activities of the investor This leads to a suitable design solution.

For example, the construction of a seafood processing factory will have a lot of salt, so the wall must be built with bricks and tiles (not tole walls because it is easy to rust). The column of the workshop must be made of concrete (not the iron pole because of rust and degraded fast). Construction of a fertilizer factory should also be made of brick walls and concrete columns to extend the life of the building.

 Nowadays, there are many design companies after signing contracts with customers, they do not directly design, but designate them for a small group of designers (called Bs), they retain 40% to 60% of contract value. So the receiver (B comm.) Is only 40% - 60% of the contract value and B is usually the new graduates, engineers graduated (not experienced), even the students are. learn the implementation. So poorly designed, unpredictable, unrealistic and unsuitable for construction, it is unlikely that the dam will be repaired. When this happens, you are the most disadvantaged: poor aesthetics, poor quality, extended construction time and costs increase, the use of poor. When selling design bidders, the B side receives small fees plus weak capacity,

 - The design price reasonable for the works (Factory, Villa, Hotel, Office ...) invite you to see  the construction design price . Designers with low quotes often have weak capacity, so the quality of the design file is poor and when the construction investors have to dismantle and repair several times and this makes the cost of construction will be higher than the difference in cost of design, quality is poor. In addition, designers who design low cost, they design waste (such as the work of 300 tons of iron, they paint another 60 tons more to no responsibility. It is similar to the concrete they are wasting, which causes huge damage to the owner. The design cost for the project is not large, so you should not hammer but choose the weak design contractor will cause great damage to yourself (the investor).

*** A perfect design requires the following elements  :

       * Designing company:  Direct design (not design contractor), architect and construction engineer must have many years of design experience in the office and many years outside construction, religious Good career.  

       *  Architecture: Beautiful exterior design, especially the facade should be beautiful and suitable for the surrounding landscape, the layout of the floor is reasonable, air ventilation, natural light is thoroughly exploited. Need to create a natural well for natural air. Limit air conditioning (where office work) to prevent sinusitis, cold. In addition to beautiful elements, ventilation, appropriate functions suitable production lines, we need to pay attention to feng shui: kitchen (if the factory has a kitchen), kitchen position, stairs The number of stairs per floor is in the Birth (4N + 1) or Older (4N + 2) where N belongs to the set of natural numbers. Booking Position Director. Bathrooms and WC are not located above the kitchen. Main doors are essential to create a living environment. The size of the main entrance to the building and the dining room doors, good supply (financial, financial, hygiene, insurance, medical science, fine sand, children ...)  ; Separate the door to the toilet must take a hole with a bad bow to limit the gas to the area is not clean . In the mathematical proposition, the wrong thing goes wrong. (The unclean sanitary area of size with the bad supply of the entrance to the toilet will not give birth to air here, so vitality comes to where we are. need). With the choice of such door size, life will come to places such as kitchen, dining room, bedroom, stairs ...) so designers need to know feng shui will work better great number of. In addition, if you live generously, compassion along with the right design feng shui will make your career develop fast, sustainable, happy family, good health ... collective toilet It should be placed at the end of the workshop to ensure hygiene. If the front toilet is not clean, especially the gas does not enter the factory, making production activities are not favorable. The factory should design shutters or concrete slabs on the upper part of the wall to allow the heat to escape from the workshop, cooling the workshop. Doors need insulation.

       *  Structural section: Prior to design engineers must know the geology of the site to be designed to design the nails accordingly. (If you do not know geologically can lead to nail is not guaranteed strength or can lead to waste. big for the investor). To ensure solidity of the whole project including foundation, beam, column, beam, floor, bracing, wall, frame system of steel building. The advantage of pre-engineered steel buildings is that the beams pass very well (the span can exceed 60m) so the inside of the workshop is very well ventilated. However, if the demand for the workshop does not require large internal space, the design engineer must adjust the span to reduce the cost of the work. At present there are some weak structural engineers, not knowledgeable about architecture, so the layout of the momentum, the column protruding out of the wall is very narrow inside the house, lost space, space encroachment, loss of aesthetics. At present there are many non-experienced and weak structural engineers, so instead of the design from the foundation to the roof for example 300 tons of iron is to ensure safety and good bearing. These engineers lacked the responsibility and lack of confidence, so they added another 60 tons of iron to their peace of mind (a total of 360 tons of iron). This caused the phenomenon "crispy crunch" texture and huge waste to the owner. Structural design is very important to ensure the strength, but must be reasonable. This is only good engineers, experienced, conscientious and responsible to implement. 

       *  Electrical system:  It is necessary to design the pipes and electrical cables of good quality, note how many rooms are in each room, how many lamps, air conditioners, ... Overload. In the factory, it is important to understand the capacity of all the machines to design the load line. It is also advisable to design a backup generator and line.

       *  Plastic drainage pipe system:  It is necessary to design good pipes (longevity). At present, there are a number of sewer design companies located in the columns. This is a very serious fault, because the plastic pipes in the column will reduce the column strength of the concrete to reduce the strength, not to mention the water in the process of cracking can be water permeability. This leads to the iron column, dangerous for the work. After the use time, the water pipe will be aging and the water to the column to cause damage to the building. The plastic pipes draining water to the manholes need a rabbit to keep the water, so as not to foul odors from the sewer into the house. Drainage system outside the factory should arrange piping and manholes to avoid clogged water. 

       *  The telecommunications system:  cable television, ADSL or WiFi, telephone wire, CCTV, doorbell screen, ... should be clearly shown in the design.

       *  Lightning protection: Your  building needs to design a lightning protection system, including lightning collecting needle (lightning collecting needle 107m, 101m, 75m, 63m, 51m, 41m ...) Copper conductor leads from the lightning collecting needle to the grounding piles and into the ground.

       * Fire protection, fire alarm and automatic firefighting:  This part is often used for buildings, hotels, restaurants, offices ... to secure people and property.

         The design must have exit doors (very necessary in the event of an incident): On all floors (if the house has a balcony) must have a door to open the balcony (the door will exit good than many doors open). If the alley is less than 6m without a balcony, it can make an indented balcony (called a lot) and open the door to exit to escape. If you do not do the balcony, the window in the front of the floor is guarded iron frame and here the hinges are locking the security frame (in case of fire or explosion, unlock the protection frame to escape).

 

 

http://nhatienche.vn/upload/images/900(1).jpg

Factory design. The office + workshop of Phuong Vu Garment Company Limited, covering an area of 10.000m2, is built on a land area of 25,000 m2. This office + factory is the workplace of nearly 100  foreign experts and experts and more than 1,000 skilled workers, modern technology. Garment export to USA, Japan and Europe .... Designing the system of reinforced concrete pile foundation is very safe, the structure is prefabricated steel frame construction, using Q345 steel very durable, The wind is very cool , airy, anti-lightning system and modern fire safety. Internal road system Spacious parking lot. Design leader: famous architect Vu Anh Tuan. Design and construction unit: Quoc Cuong Trade Construction Co., Ltd. The next week began to pile. Location: Tram Chim Town, Tam Nong, Dong Thap.

 

 

 

http://bietthudep.com.vn/upload/congcong/VIEW_3-min.jpg

DESIGN OF MANUFACTURING AND BUILDING FACTORY. EMERGENCY MANUFACTURING FACTORY. AREA 6.2 HEC TA. LOCATION: NUI THANH DISTRICT, QUANG NAM PROVINCE. OCTOBER 2015.

 

 

 

http://quoccuong.com.vn/quoccuong/images/Image/aaaaa/view%202.jpg

HOUSE DESIGN FORM,  PRICE PREPAYER, PREPAYER DESIGN. DESIGN MANUFACTURER OF FOOTWEAR MANUFACTURING COMPANY. LOCATION: Binh Duong Province, September 2016.

 

 

http://nhavuon.net.vn/upload/images/IMG_2%20900.jpg

 

http://nhavuon.net.vn/upload/images/IMG_1%20900.jpg

Factory design. The factory + office of Mr. Thanh with the construction area of 11,000 m2 on the land area of 22,500 m2. The workshop is designed very firmly, withstand typhoon level 15. Design leader: famous architect Vu Anh Tuan. Design and construction unit: Quoc Cuong Trade Construction Co., Ltd.Location: Quang Nam Province.

 

 

 

http://nhatienche.vn/upload/images/VIEW750%203.jpg

DESIGN WORKS, PREPAYER STEEL BUILDING HOANG LONG AGRICULTURAL PRODUCTION AND PROCESSING JOINT STOCK COMPANY. LOCATION: CHAU DOC DISTRICT - AN GIANG PROVINCE. April 2018.

 

 

 

http://nhatienche.vn/upload/images/VIEW750%202.jpg

DESIGN WORKSHOP. STEEL BUILDINGS. MINH DUONG FURNITURE PRODUCT CO., LTD. LOCATION: TRANG BOM DISTRICT, DONG NAI PROVINCE. April 2018.

 

 

 

 

http://bietthudep.com.vn/upload/congcong/VIEW_3_1-min.jpg

 

http://bietthudep.com.vn/upload/congcong/Xin-phep-xay-dung-nha-xuong-6-min.jpg

DESIGN FACTORY, FISHERY HIGH QUALITY FACTORY. LOCATION: THANG BINH DISTRICT, QUANG NAM PROVINCE. December 2016.

 

 

 

 

http://nhatienche.vn/upload/images/nha%20xuong%20long%20an%203-4-2018(1).jpg

 

http://nhatienche.vn/upload/images/nha%20xuong%20co%20khi%20dang%20xay%20dung.jpg

DESIGN WORKSHOP, BUILDING BUILDING. MECHANICAL FACTORY IN TAN DUC INDUSTRIAL PARK, DUC HOA DISTRICT, LONG AN PROVINCE 

 

 

 

http://nhatienche.vn/upload/images/IMG%20900.jpg

 

http://nhatienche.vn/upload/images/IMG_2%20900.jpg

Factory design. Factory, Chuy Israel Export garment has an area of 3.3 hectares. Location: Cai Rang District, Can Tho City. The whole system of foundation and foundation is pressed pile D300 very solid. The system of columns, prefabricated steel buildings use high strength steel Q345, Epoxy paint on the entire surface of the steel frame so very durable with time. Lightning and fire protection systems are equipped with modern, very safe. The ventilation system is designed so that it is very well ventilated. The internal road system runs around the factory, separated from the surrounding buildings so it is well ventilated. The entire wall brick building with a wall thickness of 200 should be good insulation. FDI capital. Design leader: famous architect Vu Anh Tuan. Design and construction unit: Quoc Cuong Trade Construction Co., Ltd.

 

 

 

http://nhatheptienche.net.vn/upload/images/V2(1).jpg

http://nhatheptienche.net.vn/upload/images/V%201(1).jpg

DESIGN WORKS, DESIGN WAREHOUSE, BUILDING BUILDING. RICE PROCESSING FACTORY AS. LOCATION: An Giang province. APR.

 

Major production plants usually have the following items:

a / Guard house, gate, fence, garage

b / Office cubicles (office space for directors, office staff, meeting rooms, staff restrooms, office restrooms)

c / Serving divisions (cafeteria, specialist residence, worker's place, worker's entertainment area, worker's toilet)

d / Main production workshops, raw material warehouse, finished product warehouse, product quality control area.

e / Truck scale

f / The system of yards, internal roads, trees  (aiming to   create beautiful scenery, increase oxygen content, prevent dust, reduce noise, cool and prevent fire spread) , underground water reservoirs

g / Waste water, solid waste, air

h / Local and general water supply and drainage system for the factory, water tower

i / fire prevention and fighting systems, fire fighting, automatic fire fighting, lightning protection; CCTV system around the factory.

J / Transformer station

       Factory design, warehouse design, prefabricated house design, factory design, office design ... is very important to make beautiful works, ensure the ability to use, safe with reasonable investment.

        In order to successfully complete the above design, the implementers must be well-qualified architects with many years of practical experience and well-trained construction engineers. field experience.

        Quoc Cuong Trade Construction Co., Ltd has a well-trained architect and engineer who has more than twenty years of experience and has experienced experts in Feng Shui for quality design. Perfect for your project. Please come to Quoc Cuong Company to receive the best service with the best quality.

Hotline :  0988.55.88.79 ,  0903831312

Headquarter: 285 Vuon Lai Street, Phu Tho Hoa Ward, Tan Phu District, Ho Chi Minh City, VietNam.

Email: qc@quoccuong.com.vn

Website:  quoccuong.com.vn  ;  bietthudep.com.vn  ;  xaynha.com  ;  nhatienche.vn  ;  thietkenha.net.vn ; nhatienche.net.vn